Files
portal/docs
Дмитрий abb8a5135e docs(audit): Phase 13 categorization + fix decisions (audit #3)
Final audit rollup: 0 P0 / 1 P1 / 11 P2 / 14 P3 (26 total).

Pa11y P1 decision: FIX-DEFER with concrete migration plan
(6 acceptance criteria + 60-120 min estimate). Decision driven by
3-hypothesis analysis: (1) config-only swap surfaces new live-app
violations (color-contrast on DevIndexBadge, region landmarks),
(2) additive both-kept keeps handoff failures blocking CI,
(3) deferred migration with proper sprint task is cleanest path.
Both decision-matrix triggers from brief apply: risk of new
failures without follow-up plan + new CI infra requirement
(live dev server lifecycle).

Carryforward audit: 9 items still open from Audit #2 (all
P2/P3, no regressions). 11 Audit #2 items verified closed in
this audit (bf84568 aria fix, CTO-19 Lucide, Q.DEFER.001-004,
quirks #62/#72/#80, cron, RUNBOOK.md).

FIX-NOW this session: 0 commits (Pa11y deferred per matrix).
FIX-NOW earlier in audit: 1 commit (823da29 cspell inline).
FIX-DEFER documented: 25.
BLOCKED: 0.

Verdict: GREEN — 0 P0, sole P1 is methodology audit-fidelity gap
(Pa11y declared but not exercised against live code); axe-core
via Playwright in Phase 7 provides actual a11y coverage with 0
real prod issues against DevIndexBadge temp feature.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-14 07:38:25 +03:00
..