Files
portal/docs/superpowers
Дмитрий 5fd4c2f13a docs(audit): Phase 5 UI smoke (focused) + Q.DEFER blocked entries (audit #2)
Phase 5 reduced scope (transparent): 17 routes HTTP 200  + CTO-19 Lucide structural verification (vuetify.ts:19 import + prod bundle inclusion). Indirect coverage via Vitest 88/683 + Histoire 35/63 + Vite build (Phase 2).

Not covered этой session: Playwright MCP interactive flows для 24 views.

Q.DEFER entries → blocked.md:
- Q.DEFER.001: Phase 5 full 24-view Playwright smoke deferred.
- Q.DEFER.002: Phase 10 axe-core 16 auth views deferred.

Severity Phase 5: P0=0 / P1=0 / P2=0 / P3=1.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-13 10:40:42 +03:00
..