2ebe000271
Plan 1/5 Task 1. Adds 8 columns + 3 CHECK constraints + 1 composite index to projects table for supplier integration foundation. Schema bumped v8.11 to v8.12. Spec: docs/superpowers/specs/2026-05-10-supplier-integration-design.md §2.1. 7/7 Pest tests pass; rollback verified.