Files
portal/docs
Дмитрий 2b7a71c5b6 docs(brain): implementation plan фазы 1+2+3 LLM-first router overhaul
План из spec v2.2 — 22 задачи (Task 0 pre-flight + 8 phase-1 + 8 phase-2
+ 6 phase-3) в bite-sized TDD-формате.

Phase 1 (foundation+archive): tag + archive scaffold + inventory hooks +
discipline-metrics decision + test-rollback.mjs (TDD) + archive §12/routing-
docs/memory + §17+ADR-016 + cross-refs §12→§17 + flags+ROLLBACK.md.

Phase 2 (classifier): router-config + nodes.yaml capabilities + prefilter
3 группы/manual-override/anchor (TDD) + Sonnet 4.6 classifier+памятка (TDD)
+ missed-activations на nodes.yaml (TDD) + embedding (TDD) + §17 gate (TDD,
D1 continuation-not-exempt) + prehook inheritance+cost (TDD) + parser v4.0
+ C1/C2 adapters + warmup hook + flags flip.

Phase 3 (evidence loop): Stop-hook execution_trace+chain_gaps+inheritance-
copy (TDD) + self_assessment (TDD) + reviewer subagent verify + direct-API
fallback handler + sanity-generator + brain-retro v2 procedure + self-
retrospect skill + analyzer v4 + status-md cost sections + schema v4.3 +
final flags + rollback dry-run verification.

Self-review: spec coverage (8 слоёв + §17 + 16 находок v2.2), 0 placeholders
(кроме намеренного model-ID резолва Task 0/9), type consistency проверена.

Реализация — после Биллинга v2 Спек C. Фаза 4 (distillation) — отдельный
план через ~6 месяцев. НЕ исполняется сейчас (per user).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-25 06:08:08 +03:00
..
@
2026-05-17 15:19:19 +03:00